Villaggio Gandusio - Fight Energy Poverty and Act on the Community

0

Villaggio Gandusio - Fight Energy Poverty and Act on the Community

Mismatches Segregation Functional adequacy Vulnerable groups Climate change
Policies and regulations Participatory processes
Promotion and production Public promotion Participatory processes

Main objectives of the project

Bologna is a vivid city, with a dynamic university atmosphere and a rich diversity of people and economy. Yet, rental prices are one of the highest in Italy. Moreover, the few social housing units that exist face two interrelated issues: building degradation and social vulnerability. To tackle both of them, the Municipality of Bologna started a refurbishment of Villaggio Gandusios social hosuing units. The goal was to make them ecologically resilient in a context of increasing heat waves while acting on their communities, building a stronger social engagement of the neighbours.

Date

  • 2018: Construction

Stakeholders

  • Promotor: ACER

Location

Continent: Europe
Country/Region: Bologna, Italy

Description

Over time, the public housing complex located at Via Gandusio no. 6-8-10-12 has not only suffered from typical physical deterioration but has also witnessed a rise in social tensions. This escalation is partly attributed to the clustering of vulnerable situations within the same environment, negatively impacting the overall housing quality and neighborhood dynamics. In response to these challenges, the Municipality of Bologna, operating through its management entity, ACER, initiated a comprehensive endeavor in 2018 to renovate the buildings and enhance energy efficiency. However, the primary aim extended beyond mere energy resilience of the buildings regarding heat waves. The main goal was to address the social needs of the residents.

The renovation process encompassed various measures, including upgrading façades with thermal insulation, improving maintenance of balconies, roofs, atriums, and stairwells, enhancing electrical and gas systems, replacing fixtures, and installing heat meters across 160 apartments and communal areas.

The overarching challenge was to transform one of the city's most problematic public housing areas into a hub of social innovation, serving as a model for potential replication. Villaggio Gandusio aimed to integrate seamlessly into the neighborhood fabric, prioritizing living quality and social inclusion through sustainable social diversity and collaborative projects. Achieving this objective necessitated coaching, social mediation, and fostering peaceful coexistence among residents. To facilitate this, dedicated facilitators maintained a permanent presence within the community, supplemented by training sessions to empower residents as facilitators themselves. The refurbishment office also housed social mediators who actively addressed conflicts and introduced digital communication channels for neighbor interactions.

Furthermore, efforts were made to enhance communal spaces and green areas through community-driven activities, fostering a stronger sense of belonging and unity among residents. A key aspect was promoting a more diverse community makeup, exemplified by an agreement with Er.go (Regional Authority for the Right to Higher Education) to allocate certain apartments to low-income university students engaged in community care projects, particularly assisting residents' children with after-school activities, which proved to be highly successful.

This transformative project turned Via Gandusio from a conflict-ridden and neglected area into a beacon of civic engagement and cooperation between residents and public institutions, serving as a blueprint for similar interventions in other large social housing complexes. Through the dedicated efforts of social mediators, this approach instilled a positive sense of community, empowered residents, nurtured care and respect for shared resources, and facilitated the formation of self-support networks among neighbors.

Startblok - a social living project for integration

0

Startblok - a social living project for integration

Mismatches Cultural suitability Vulnerable groups
Policies and regulations Governance
Promotion and production Self-management

Main objectives of the project

Startblok is a housing project for young refugees who have recently received their residence permit (status-holders) and for young persons from the Netherlands. Pursuing a diverse community, a self-management governance and an affordability scheme opens the door to an innovative integration project in Amsterdam. A former sports-grounds next to the A10 highway in Amsterdam New West has been transformed into this pioneer housing project, aiming for a better understanding of social housing, mixture and community.

Date

  • 2015: Construction

Stakeholders

  • Promotor: Key
  • Constructor: Municipality of Amsterdam

Location

Continent: Europe
City: Amsterdam
Country/Region: Amsterdam, Netherlands

Description

Startblok Riekerhaven is a collaborative housing initiative established by de Key in partnership with the municipality of Amsterdam and Socius Wonen. On July 1, 2016, the inaugural residents received keys to their new homes at Startblok Riekerhaven. Since its inception, fostering a sense of community has been paramount within this project. Residents are empowered to manage their own living spaces, with every aspect of Startblok designed to encourage effort and initiative from its inhabitants. Comprising 405 living spaces across 22 corridors, most of which feature communal living rooms, Startblok caters to young refugees with permanent residence permits as well as other Dutch youth, facilitating integration and interaction among them. Applicants must be between 18 and 27 years old, with all status holders engaged in language courses and either internships or vocational training, alongside access to on-site psychological services.

Of the more than 400 living spaces, 303 are private studios equipped with individual facilities, while 102 are private rooms within apartments with shared amenities. Studios, averaging 23m2, boast personal kitchens and bathrooms and are clustered with 16 to 31 other residents, fostering socialization in communal areas. Meanwhile, the apartments include 42 units for two persons and six for three persons, with private bedrooms spanning approximately 12m2 or 14m2 and shared living rooms around 25m2. Rent prices, ranging from 350 to 430 Euros per month, significantly undercut the Amsterdam average.

Outdoor facilities at Startblok encompass sports fields and a clubhouse, with residents actively involved in creating BBQ areas, a swimming pool, and tending to vegetable gardens. Additionally, communal spaces are designed to facilitate socializing and organizing activities, with residents able to seek budgetary and organizational support from the Startblok Actief! foundation, managed by residents themselves.

Central to Startblok's ethos is its self-management governance model. Each corridor is overseen by one or two Hallway Managers responsible for maintaining communal areas and organizing activities, serving as the primary point of contact for residents in need. Five Social Managers ensure active engagement among residents and uphold standards of hygiene, safety, and livability. A general management team, composed of residents, handles accountability and day-to-day operations.

Celosia, Social Housing

0

Celosia, Social Housing

Financing
Urban Design
Promotion and production
Ownership and tenure

Main objectives of the project

This social housing apartment building is located in PAU de Sanchinarro, a new neighbourhood situated on the northeast edge of Madrid. Blocks of eight houses are seen as separate prefabricated units, which are positioned in a checkerboard pattern next to and on top of each other, leaving openings for communal gardens in between.

Date

  • 2009: Construction

Stakeholders

  • Architect: Nathalie de Vries
  • Architect: Jacob van Rijs
  • Architect: Winy Maas
  • Architect: Blanca Lleó

Location

Continent: Europe
City: Madrid
Country/Region: Madrid, Spain

Description

The opening of the European borders has caused a real estate boom in Spain. The value has been in¬creased enormously, thus leading to an enormous production of housing. This operation is facilitated in Madrid by a giant new neighborhood that sur¬rounds the old city. A series of new cities that are mainly constructed of blocks that surround a pri¬vate patio, with a more or less introverted archi¬tecture with small windows, somehow opposes the extraverted Spanish culture.

In PAU de Sanchinarro, one of these new cities, situated on the northeast edge of Madrid, two plots are given to develop a possible “escape” from the uniformity and claustrophobia of this “sea of six-story-high blocks.”

The first escape’ in this neighborhood was the Sanchinarro Mirador (2005): an apartment build¬ing in which a huge void on the 15th floor offered an open view to the surrounding mountains and over the new neighborhood.

The second escape has been created by an “open¬ing” a given block on all levels. Blocks of eight houses are seen as separate prefabricated fig¬ures. They are positioned in a checkerboard pat¬tern next to and on top of each other in such a way that they leave openings for communal gardens in between. A perforated block appears, in which shadow and ventilation compensate for the strong climatic constraints. It creates views from the street through the building. It creates views from the houses to the surrounding area. It defends against the claustrophobic conditions of the existing developments

Residential complex Villinki

0

Residential complex Villinki

Financing
Promotion and production

Main objectives of the project

The residential complex consists of four residential buildings, kindergarten and commercial services. It frames a structured public space in form of main communication axis surrounded by green areas and small playground. Publicly open community garden with fruit-trees and barbecue is integral part of the complex.

Date

  • 2015: Construction

Stakeholders

  • Architect: Matej Grebert
  • Architect: Miroslav Catlos
  • Architect: Juraj Benetin
  • Architect: Peter Moravcik

Location

Country/Region: Bratislava, Slovakia

Description

The residential complex is situated on the periphery of the Slovak capital on the edge of a large housing estate from 1970s and the fabric of scattered family houses. It lies on a hillside with southern exposure and an attractive view. The complex consists of four residential buildings with 64 mainly 1- and 2-bedroom apartments, which are complemented by kindergarten and rentable spaces for services and offices. Below the surface the parking garage for residents and visitors is situated. The central longitudinal public space is clearly articulated in terms of sloping ground and runs into the community garden. The private gardens that are part of the ground floor apartments run into the community garden as well. On the top floors of all four residential buildings are roof apartments with large green terrace, designed as a "house on a house".
The residential complex tries to solve the typical problem of periphery, where new developments meet the modernist housing estates and scraps of original rural settlements without solving the relation to the surroundings and without creating any added value in the form of public space and services. Our aim was to eliminate such negative effects of densification and exploitation of the territory. We have designed the complex in a form of pavilions that articulate the open spaces in correspondence with the urban planning principles of the housing estate embodied in the semi-enclosed courtyards. In the same time the new complex reflects the low building structure of the surrounding family houses. Unlike neighbouring monofunctional new developments the complex is hybrid structure that integrates housing, kindergarten and rentable spaces for commercial use. The residential houses are of hybrid nature when associating three different types of apartments all with large balconies, terraces or gardens with attractive views. The complex brings spatial and functional diversity to the city periphery and integrates it into the urban context.
Residential complex is realized as a reinforced concrete skeleton with brick infill. Skeleton enabled variability in ground plan solutions and integration the residential function and facilities in one building. At the same time it allowed the implementation of large glassed walls on the south facade overlooking the valley. Plastered facades surface refers to the housing blocks from 1970s and the neighbouring family houses. The stronger colours used in the housing complex help in the same time to distinguish it from the surrounding. Plaster is complemented by the wooden shutters – shades. Their elementary geometry refers to the picturesque back yards of the neighbouring old family houses. Southern exposed façades are in the same time framed in to compact stereotomic frames, which are visible especially in long-distance views on the exposed area. The choice of a simple material solution is also a direct result of the construction costs limit and subsequent marketability of apartments. The lower demands on maintenance correspond to the general low cost strategy.

Residential Complex Condominium Devín

0

Residential Complex Condominium Devín

Financing
Promotion and production
Ownership and tenure

Main objectives of the project

Housing complex in frame of the historical village structure, Bratislava-Devín, Slovakia

Date

  • 2017: Construction

Stakeholders

  • Architect: Tomas Cechvala
  • Architect: Peter Moravcik

Location

Continent: Europe
Country/Region: Slovakia

Description

Condominium Devín is housing complex in frame of the historical village structure situated in the Bratislava-Devín District, in the protection zone of the national cultural mo-nument - Devín Castle. Family houses create together a system of intimate spaces. However, on the side of the street, houses try to create a suitable mantinel for a pleasant stay in the public space. From the street, the facades of the houses are irregularly graded, making it a colorful vista and exterior spaces. New alley is integrated in the existing system of a streets of the old village under the castle rock.
New residential neighborhood in the village intravilan. A smaller scale of shared housing, a direct confrontation with the surrounding urban and historical context. Creation in a complex cultural and physical environment.

The resulting structure has formed a multi-stakeholder dialogue. Architects have tried to find a penetration between often conflicting requirements and to bring a slightly different view of housing. As a result, there is a rugged "villainous" residential structure with well-differentiated semi-public, public and private spaces, which gives the inhabitants plenty of intimacy.

We see that there is a "fair mess" in this project. There are flat and sloping roofs. Oriented sometimes by a street shield, sometimes on the other side of the street. The individual objects do not respect any unambiguous regulation applicable to all houses, no regulation, no prescribed uniformity. In spite of this controlled chaos, the result is a very interesting composition. Not only in terms of "high architecture". The result is an natural growing urban structure.
The objects have vertical load-bearing structures made of hebel brickwork. Horizontal structures are made of monolithic reinforced concrete ceilings. Prefabricated structures are made of reinforced concrete prefabricated structures, anchored through thermal insulated baskets (so-called iso-hulls). The foundations were made on base strips and thin reinforced concrete slab. Finishing facades are made of thin and coarse-grained plasters. Aluminum windows were planted in window openings.

Residential building St. Gallenkirch

0

Residential building St. Gallenkirch

Financing
Urban Design
Ownership and tenure

Main objectives of the project

Living like in a Rubik dice. A residential complex in which no other dwelling is like the other and can lend a room to another apartment just like it is needed.

Date

  • 2016: Construction

Stakeholders

  • Architect: Markus Dorner
  • Architect: Christian Matt

Location

City: Gemeinde Sankt Gallenkirch
Country/Region: Austria

Description

Since 2005, the state of Vorarlberg has been committed to building an energy-efficient building culture, particularly in integrated housing construction. This also includes a high-quality and resource-conserving building, in which economics and ecology, social and culture are in harmony.

For the new residential complex in the center of St.Gallenkirch these ideas are deduced from the local volumetry of the solitaires on the slope and applied to the new building.

a clear construction body is deliberately placed at the dedication limit and turned to the found slope.

This creates with the surrounding buildings and terrain edges, strong local-spatial relations such as to the church as well as the distant Silvretta or the Gweilgroup.
In the Montafon, the settlements were often built near the bottom of the valley in favor of the higher and better-sheltered soils on the mountain. This rural value is opposed to the reduction of the daylight of the valley. The new residential building is located on the valley's lowest settlement boundary.

A resource-conserving strategy and considerations of cost-effectiveness allow new ways to recover the lost light. Thus almost every apartment - apart from the last level on top of the building - has about eight square meters of air space over two floors. Nature and light penetrate these openings deeply into the interior and they leave the views to the outside in the distance linger.

The rooms of the apartments overlay each other and layer themselves over the floors in a central "supply core".

This high flexibility of the basic design results from the modular development concept. It is like a tetris with many solutions.
The conceptual simplicity turns itself as it were from the inside outwardly.

The energetic supply strings and the wet rooms are located around the central development zone of reinforced concrete.

Between this zone and the outer skin in a multibox construction lies the adaptable range of variance instead of addition - even in the third dimension.

The reflections on the interior are also visible in the façade.

The room-high, prefabricated riftboard elements form the frame for the lower multi-box and give the building a pleasant tectonics. A single window type is added according to the inner texture.

Block 0704

0

Block 0704

Mismatches
Financing
Promotion and production
Ownership and tenure

Main objectives of the project

Block 0704 presents a new type of urban housing that attempts to challenge conventional architectural typologies of the apartment block.

Date

  • 2013: Construction

Stakeholders

  • Architect: Christos Christodoulou
  • Architect: Marios Christodoulides

Location

Continent: Europe
City: Geri
Country/Region: Cyprus

Description

The block can be reinterpreted as a collection of ‘suburban residences’ that include two levels of spaces offering a separation of common areas and private spaces, a more immediate and effective relationship with the outside, a relatively large covered outdoor area, and the use of natural elements as deciduous trees to moderate the microclimate of each space. The relationship to the street becomes secondary with the arrangement of the spaces suggesting a more introverted experience that also encourages the modern dwellers to maximize use of the space and the relationship between indoors and outdoors. The traditional protruding verandas of the typical apartment block are reintegrated into the main mass of the building becoming an integral part of the interior/exterior spatial experience, both visually and functionally. Consequently the apartments attempt to satisfy contemporary desires which require flexibility, privacy, and a more inclusive relationship with the outdoors.
The area is relatively densely populated and characterized mostly by large residences, as well as a small number of apartment blocks, and full-grown vegetation offering shade during the summer months. It offers the benefits of a small and quiet neighborhood, with the convenience of being within walking distance to the city center.

Block 0704 includes eight apartments, four two bedroom units and four three bedroom units. The units are arranged in two levels, with the bedrooms being on a different level from the living and kitchen areas. The sleeping areas of the smaller units are on the lower level while in the larger units they are situated on the upper level.

The building was designed to reduce the need for mechanical support in creating a comfortable environment as much as possible. All apartments are two level with double height spaces and are located at the four corners of the block. Daylight enters the interior spaces from two directions and at both levels.
Also cross ventilation for cooling becomes much more effective. To allow for direct sunlight in all spaces at some point during the day, especially during the winter months, all the units have controlled openings facing either east, south, and/or west. The deep verandas facing east and west receive plenty of sunlight but prevent direct sunlight from reaching the large sliding glass doors and interior spaces during the hot summer months.

All exterior spaces are covered except the cantilevered sections of the balconies that have provisions for trees. These trees can act as a brise-soleil regulating the micro climate of the immediate covered spaces, and also of the interior spaces. The outdoor covered areas for each apartment are very generous and are in direct relationship with the interior spaces. This makes them useable at all times of the day, and for the greater part of the year.

The plot size is 669 sq.m. The interior spaces are 936 sq.m. There is an additional 316 sq.m. of covered areas. The three bedroom apartments are 150 sq.m. and the two bedroom 120 sq.m.

Apartment Building in Pagkrati

0

Apartment Building in Pagkrati

Mismatches
Financing
Promotion and production
Ownership and tenure

Main objectives of the project

The six- storey apartment building attempts to redefine the expression of a multi-unit housing building and its relationship with the existing, densely populated, urban fabric of Athens. At the same time, it is a new bioclimatic approach of organizing the front of the building block to the street and the public space of the city.

Date

  • 2019: Construction

Stakeholders

  • Architect: Demetrios Issaias
  • Architect: Tassis Papaioannou

Location

Continent: Europe
City: Atene
Country/Region: Athens, Greece

Description

After the Second World War, Greek cities developed under a particular entrepreneurial activity based on the activities of a small-scale construction industry and land acquisition. The key economic mechanism used was what is known in Greek as ‘antiparochi’, a land allowance, quid-pro-quo informal agreement between landowners and contractors, and the building model that fit the above was the multi-storey apartment building, namely the “polykatoikia” type. In order for this to work and to be profitable, plot sizes had to be of a certain dimension. This meant that many smaller plots have remained until today unbuilt, unused and abandoned, with small structures as traces and ruins of the past.

The plot, of just 119m2 and with an almost triangular shape, is what was left unbuilt in the block, defined by a partially demolished, pre-war three-storey building. If this plot was uneconomical and unprofitable for the typical contractor to develop, it consisted of a particular challenge for the design of a new building of small housing units, which would have to evolve in height.
A dense, homogenous urban form of tall apartment buildings characterizes the neighborhood. The building operates as an infill to the block, completing the continuous urban, street façades, while a sense of ‘hovering’ is created by leaving the entrance level open and permeable, creating a pilotis with a courtyard at the back of the plot. This courtyard visually connects the busy street with the small, uncovered spaces at the heart of the block.

The tubular-shaped staircase defines and differentiates the building from the adjacent “polykatoikia” and, like swivel, signifies the vertical circulation. Moreover, it liberates building mass from the party wall, expressing and transferring to the street the dynamic geometry of the triangular plot.

A particularly important strategic decision, which serves the environmental and bioclimatic design, is the creation of a layered façade, from the second level to the top of the building. At the top floor, the façade folds and turns into a pergola of a generous roof garden offered to all inhabitants to enjoy the spectacular, panoramic view to the city and its two most characteristic landmarks: the Parthenon and Lycabettus Hill.
The building is constructed of reinforced concrete, left un-plastered and in its natural color, both externally and internally. There is also extensive use of metal elements, in secondary structural elements, window frames and various details. The bioclimatic performance and energy output of the building was of particular concern with natural light and ventilation for all spaces and the use of renewable energy sustainable systems. The wooden panels are a key characteristic of the morphology and materiality of the project. Apart from creating double façade for solar protection and management, they operate as filter for the noise and the disturbance of the city, forming private semi-outdoor spaces. The panels are movable and therefore introduce an element of constant and dynamic variability through time.

Finally, the project explored the organic relationship between architecture and art, with the introduction of carefully selected forms from the work of Greek painter Alekos Fassianos that define different edges of the project. The architects also designed most furniture and internal equipment, made of plywood boards and timber in natural color.

Serpentine House Refurbishment

0

Serpentine House Refurbishment

Policies and regulations
Financing
Promotion and production
Ownership and tenure

Main objectives of the project

The Serpentine House is one of the best-known residential developments from the post-war years in Finland and listed by DOCOMOMO Finland as a significant example of modern architecture. The aim of the refurbishment project has been to preserve and enhance the building´s architectural values while solving multiple technical and functional issues.

Date

  • 2020: Construction

Stakeholders

  • Architect: Marica Schalin
  • Architect: Kristina Karlsson
  • Architect: Mona Schalin

Location

Continent: Europe
City: Helsinki
Country/Region: Finland

Description

The long, undulating, four storey tenant block, with its 189 rental flats, is situated on a hilly site at the edge of an garden city area. The courtyards have been redesigned preserving the sylvan character.

The flats consist mainly of two rooms, kitchenette and bathroom. They have been upgraded with special attention to bathrooms, fixtures and fittings. The original kitchen cabinets have been repaired when possible.

Common facilities have been refurbished.

The roof slab has been replaced by a ventilated construction. The exterior rough plastering and balconies with their delicate railings have been reconstructed. Windows and balcony doors have been repaired and any details in poor condition have been replaced. The original colour scheme has been reconstructed in collaboration with a conservator, applying traditional paint methods.
The long road from preliminary condition surveys to successful completion of construction can be seen as a didactic example of a process with many stakeholders involved. Not least because of the specific challenges concerning the conservation of modern architecture.

By 2010, the exterior and the dwellings had long suffered from lack of funding for maintenance. Rejecting the initial renovation programme, based on purely technical and functional priorities, the building permit authorities demanded focus on architectural values. Eventually, the Serpentine House, both buildings and site, were protected in a detailed town plan.

Since the protection had established strict boundaries for intervention, preserving the original architectural, spatial and material characteristics clearly emerged as an objective shared by the client, the authorities and the design team, even as the task was to solve serious technical and structural problems and introduce functional improvements.

The implementation was planned in two stages, the first stage serving as a test lab for the methods and practices during the four years of construction.
The main improvement issues have been the technical performance of the roof and the external walls, built of brick and Betocel blocks. The balconies from a time when steel was scarce, have been rebuilt. The ventilation duct system has been renovated.

The Serpentine House has received publicity as a model for sustainable renovation - the original wooden windows and kitchen cupboards have been repaired with carpenters´skills, the natural ventilation has been improved, the tenants have been able to return to their flats after the construction, the common facilities and the courtyards have been improved.

The future lifespan of the 70 years old buildings has now been secured. The lasting features are the loadbearing structure, the building envelope and the floor plan, while roofing, ventilation, plastered and painted surfaces, fixtures, cupboards, windows etc. will require maintenance according to an appropriate plan. Fortunately, Helsinki City Housing Company has an expertise in dealing with the maintenance of a huge amount of buildings from the 20th century.

5 Social Dwellings

1

5 Social Dwellings

Policies and regulations
Urban Design
Promotion and production
Ownership and tenure

Main objectives of the project

This is the first project completed by the Institut Balear de l’Habitatge – IBAVI (Balearic Institute of Social Housing) that continues the Life Reusing Posidonia research line in Formentera, in this case adapted to the Mallorca resource map.

Date

  • 2019: Construction

Stakeholders

Location

Continent: Europe
Country/Region: Spain

Description

Marès stone, the industrialized material with the smallest ecological footprint in Mallorca, is the material used to built all the walls of the 3-storey high building. The objective is to demonstrate that the construction of load-bearing walls with this material, abandoned in the structural use of multi-family buildings for the last 30 years, allows compliance with current regulations, the Sustainable Development Goals and recovering its own material culture.

The CO2 emissions embedded in the facade construction system are 31,62 kg/CO2 per m2. If the façade had been solved using a conventional solution, the emissions would be 126,04 kg/CO2. In other words, the pollution produced during the construction of the façade has been reduced by 75%. This approach has been extended to all elements of the building. Passive measures in the summer season have been prioritized, introducing inertia as a basic element of temperature regulation.
The building is located in Son Gotleu, which began to develop in 1943. Initially, the urban fabric combined the typologies of closed blocks with one floor or two floors terraced houses with a patio, with isolated single-family houses. During the 60s, with the aim of accommodating the workers arriving from Spanish mainland, these single-family houses were replaced by blocks following the line of the modern movement, built in the cheapest way possible that have become, eventually, a source of social conflicts. In fact, Son Gotleu is one of the neighbourhoods with the highest index of social vulnerability and concentration of population with few economic resources. This conflict is another collateral effect of mass tourism in the 1960s.

The project recovers one of the best features of the area: the small terraced houses built in marès, the local stone, and revealing the map of resources of the island, which is once again economically viable in the 21st century thanks to the thermal and acoustic of the technical requirements and the different European directives. The climate emergency makes it possible to reuse those systems that would have prevented such a climate crisis.
Marès stone, the industrialized material with the smallest ecological footprint in Mallorca, is the material used to build the 3-story high building, except for the elevator shaft, made of white reinforced concrete to comply with the earthquake resistant regulations. The construction system is the same as the one used by Jørn Utzon in Can Lis in 1972: 20 cm internal load-bearing walls and a 10 cm external rain wall. In order to meet current habitability requirements, a 10 cm recycled cotton insulation has been incorporated into the air chamber, protected with a breathable waterproof sheet, low-emission glass with watertight FSC-certified wood carpentry, and BCN roller blinds have been installed.

The distribution of the five houses, takes advantage of all possible buildability by using the duplex typology on the right side of the staircase, where the two houses on three floors ara placed like a Tetris. On the left side of the staircase there are three simplex dwellings, one per floor. The houses are peasants and enjoy cross ventilation.

The building is A energy class, and the production of ACS is carried out aerothermal pumps, supported by a battery of photovoltaic panels.